We will be hauling out on March 28 with a planned return to the water one week later. The plan is to do the following:
- Bottom paint
- Replace the zincs (there are 4 of them)
- Paint the boot stripe
- Install a new thru-hull for the future water maker.
No comments:
Post a Comment