So we are scheduled to haul Terratima on March 28th at 9 AM. She comes out of the water to have the following done:
- Bottom antifouling paint
- Replacements of 4 zincs: 2 for the bow thruster, one on the propellor shaft and one on the stainless steel keel-to-rudder connection.
- Repaint the bootstrap with 2 part Interlux Perfection
- Install a new thru-hull intake for a future water maker.
We will photograph all of this and post it as it happens.
No comments:
Post a Comment