Saturday, May 20, 2017

Bottom Paint, Epoxy, and Zincs

We were out of the water for 3 weeks completing the watermakers install.  We had a bad discovery that we did not have an epoxy barrier coat so we sanded the bottom and applied 3 coats of epoxy.  Then 2 coats of anti-fouling paint.  Big (and expensive) job.


Bottom After All the Work



New Zincs on the Thruster



Cleaned Up Prop



Zinc on Propellor Shaft



Zinc Block on the Rudder Connection to the Keel




Ready to Go Back in the Water

WATERMAKER INSTALL COMPLETE

Our Aquamaax watermaker is now fully functional.  We will be testing it over the next couple of months especially when we are off cursing in a few weeks time.  

Sunday, March 19, 2017

WATERMAKER INSTALL - Continued

The electrical portion needs to be completed.  We now have the ElectroMaax 160 Amp alternator and serpentine belt kit installed.  Remaining to be done:


  • Installation of charge regulator and its remote panel
  • Installation of additional faucet for water sample at the sink
  • Installing tubing for water sample faucet
  • Installing brine discharge to the sink drainage
  • Installing fresh water connection for fresh water backwash
  • Complete all electrical connections, breakers and switches. 

Sunday, February 12, 2017

UPDATE

This has been a very busy couple of months, so forgive us not making any posts during that time.  Most of the free time in January was spent in a course to get my Amateur Radio License.  That has been accomplished and I have passed the exam for Basic with Honours.  I will post the official call sign for our nation as soon s we receive it from Industry Canada.  

Friday, November 11, 2016

Watermaker Install 3

We have located and installed the control panel and the two pressure vessels as shown below



AquaMaax Control Panel Installed in the Shallow 
Locker Below the Galley Sink


This is the Wet Locker Where We Have 
Installed the 2 Pressure Vessels


Pressure Vessels Installed
The Blue Line is the Product Water Line


Lower View of Pressure Vessels




Top of the Pressure Vessels Showing Feed and 
Discharge Connections and Product Water Line
The Brass Fitting at the Upper Left is the Cockpit Locker Drain

COMPLETE THE STORY

 Hello all.  I must admit to being a bit reticente in completing the story of our trip to Mexico.  It is marred by an incident of mental hea...