We have located and installed the control panel and the two pressure vessels as shown below
AquaMaax Control Panel Installed in the Shallow
Locker Below the Galley Sink
This is the Wet Locker Where We Have
Installed the 2 Pressure Vessels
Pressure Vessels Installed
The Blue Line is the Product Water Line
Lower View of Pressure Vessels
Top of the Pressure Vessels Showing Feed and
Discharge Connections and Product Water Line
The Brass Fitting at the Upper Left is the Cockpit Locker Drain
No comments:
Post a Comment