Sunday, May 31, 2020

REFIT OF THE RUNNING AND STANDING RIGGING

In preparing for offshore sailing, we are replacing the running and standing rigging.  Here is a few pics and videos of the process of removing the mast.  We took the boat to the yard in Steveston, BC to have the rigging done.  We left the mast and other items with the rigger and took the boat back (mastless) to our slip.  We return in a few days to have the mast stepped.





Preparing the Mast for Hoisting



Hoisting the Mast Begins



Lowering the Mast onto a Cradle 




The Mast Saddle Is On The Keel Below




Had To take Down The Boom First






SOLAR COMPLETED

The solar installation is complete now with all the panels in place, wired and the deck lights and nav light rewired.


Starboard Panels Complete



Port Panels Complete

Friday, April 17, 2020

REINSTALLING AND ADDING SOLAR PANELS

With the wind generator now in place, we looked at how to add the solar panels.  We opted for the use of standard bimini fittings with 1" stainless steel tubing.


1" Stainless Tubes Mounted to Arch




Port Side 1" Tube Mounts




First of Four Panels Mounted



Detail of Panel Connection to Arch


Second Panel Installed



Wednesday, March 25, 2020

NEW CHART PLOTTER

We had to change our chartplotter because charts are not available in the CF format.  Consequently, we have a new Raymarine Axiom Pro 9 to replace our Raymarine C120W. 


Axiom Pro 9 Mounted in a NavPod at the Helm

Monday, March 23, 2020

INSTALLATION OF WIND GENERATOR PART 2

Here it is all completed


Finished



Locker With Charge Controller



Neat Installation

INSTALLATION OF WIND GENERATOR


Adding the all important energy generation gizmos on the arch.  After the generator, there will be the 4 solar panels.


Wiring Fished Through the Arch




Open Area Behind the Locker Rear Panel




Hybrid Charge Controller Mounted to Locker
Rear Panel




Sunday, February 2, 2020

PREPARATIONS FOR DEPARTURE

As we contemplate leaving for warmer climes, we are readying the boat for our adventure.  Currently the tasks include:


  • Replacing the MFD (we cannot get charts for our Raymarine C120W)
  • Installing the support for the wind generator
  • Installing the wind generator and charge controller
  • Buying an EPIRB and MOB AIS units
  • Buying a 6 person offshore life raft
  • Re-rigging the boat.  All the cordage is 10 years old and the PNW is not kind to that stuff.  Will also check all standing rigging.

New Support for the MarineKinetix MK4+
Wind Generator.  Note the Cord Taped 
on the Side to Fish the Wiring


New Raymarine Axiom Pro 9 to Replace
the C120W MFD



New NavPod GP 2050-98 Cut for the Axiom





COMPLETE THE STORY

 Hello all.  I must admit to being a bit reticente in completing the story of our trip to Mexico.  It is marred by an incident of mental hea...